Sunday, July 6, 2014

Measurement 4 QSB2125

Measurement 4 is lectured by Sr. Chang. This lessons covered more on external works such as sewerage pipe, drainage system, bored piling and road. Through the lesson, I have a greater understanding of constructing the external elements like culvert, drain and sump. Now, I am able to put theories we have learnt from Construction Technology to the taking off practice.


One of the highlight for this semester is ECA Workshop. All students are divided into specific groups and attended a week of ECA Workshop. It wasn't an easy for all of us at first because we weren't familiar with this new knowledge. I am glad that the we received help from seniors as well as lecturers and make this workshop presentation a success.




Team for ECA workshop for a week.

For this subject, the second assignment given is pretty challenging. This assignment is where we need to come out with actual quantification while preparing a full set of tender document and it tested on our problem solving skills as well as teamwork and leadership. Despite leading the team, my task was to quantify the items such as piling works, internal finishes and fencing and compiling the tender document. I would say it is not an easy task especially in the preparation of tender document. As we all know, preparing tender document is the role for a consultant Quantitu Surveyor. One has to be very detailed and careful during the preparation stage in order to prevent any discrepancy. Besides tender document, there was also time when I faced problem in doing the taking off list for fencing. I am thankful that I have the corporate team who is there with me towards completing the entire assignment.

In short, this subject is where we can maximize our strength and contribute fully to the team, io order to cover our own weakness. Team ultilization and empowerment is so much important in this assignment and I am glad that we all have done a good job. 

No comments:

Post a Comment